The Suburbanite
  • ODOT unveils projects for Stark roads, bridges

  • Projects include $14.3 million resurfacing of I-77 south of city, and paving, drainage work on Lincoln Way East in Perry Township.

    • email print
  • Construction season has arrived, according to the orange barrels dotting area roadways.
    The Ohio Department of Transportation will spend $48.4 million on 20 road and bridge construction projects on state and federal routes in Stark County this year, agency officials announced Wednesday.
    In 2012, ODOT spent $51 million on similar projects in Stark. ODOT has either started work on a dozen projects representing $26.5 million of work or contracted with a construction company for the work. Another $21.9 million of projects will begin later this year.
    ODOT will resurface I-77 south of Canton to the county line. The $14.3 million project started recently. A minimum of two lanes of traffic will be maintained in each direction during peak drive times. Dueber Avenue will close for 75 days.
    The project includes repairs to 10 bridges, including two each over Gracemont Street, Downing Road, Prairie Road, Rinker Street and Dueber Avenue over I-77 and Fohl Street over I-77.
    Among the projects already underway is a paving and drainage project on Lincoln Way East, from Eden Avenue NW to Woodlawn Avenue NW, in Perry Township. The $2.2 million project closes a gap created by other paving projects. ODOT previously paved east from the Massillon city limits to Eden and west from the Canton city limits to Woodlawn.
    Perry Township Trustee Lee Laubacher and State Rep. Kirk Schuring intervened in November when ODOT’s preliminary plans lacked what Laubacher felt was inadequate drainage. As a result, ODOT added eight more catch basins, mostly around Perry Drive.
    “It gets the water off of (the road),” he said. “Accidents occur because of the water, and when water is on top of the blacktop, it destroys the road. There haven’t been any catch basins in the area of Perry Drive. ... It’s been neglected and neglected by ODOT.”
    ACTIVE PROJECTS
    • Various routes, Canton and Massillon
    COST: $300,000
    START DATE: April 2013
    COMPLETION DATE: Sept. 2013
    DESCRIPTION: Miscellaneous bridge repairs to the U.S. 30 bridge over state Route 21, the I-77 northbound ramp to U.S. 30 eastbound and the I-77 bridge over Cleveland Avenue.
    TRAFFIC: One lane of traffic will be maintained in each direction during non-peak traffic hours along U.S. 30 and I-77. Various ramp closures on weekends. Fifteenth Street will be closed for a week. Detours will be posted.
    • State Route 21, Navarre and Bethlehem Township
    COST: $4.1 million
    COMPLETION DATE: October 2013
    DESCRIPTION: Resurfacing of State Route 21 from the Tuscarawas County line to U.S. 62. Includes bridge replacement on State Route 21 over the Tuscarawas River just south of the Navarre. Includes other miscellaneous bridge repairs.
    TRAFFIC: State Route 21 will be closed for 240 days. One lane of traffic will be maintained during all other times. Detour will be posted.
    Page 2 of 5 - • I-77, Bethlehem, Pike & Canton Townships
    COST: $14.3 million
    COMPLETION DATE: June 30, 2015
    DESCRIPTION: Resurfacing of I-77 from the Tuscarawas County line to Canton line. Includes repairs to 10 bridges including two over Gracemont Street, Downing Road, Prairie Road, Rinker Street, Dueber Avenue over I-77 and Fohl Street over I-77. The I-77 northbound structure over Gracemont Avenue will be constructed and I-77 will be resurfaced from Brinker Street to State Route 800.
    TRAFFIC: Two lanes of traffic will be maintained in each direction of I-77 during peak traffic hours. One lane of traffic will be maintained in each direction of I-77 during non-peak traffic hours. Dueber Avenue will be closed for 75 days. Detour will be posted.
    • U.S. Route 30, Canton and Canton Township
    COST: $2.3 million
    COMPLETION DATE: Sept. 2013
    DESCRIPTION: Resurfacing of U.S. Route 30 from State Route 43 to Trump Avenue. Project includes bridge repairs.
    TRAFFIC: One lane of traffic will be maintained in each direction of U.S. 30.
    • U.S. Route 62 and State Route 183, Alliance
    COST: $1.1 million
    START DATE: April 2013
    COMPLETION DATE: August 2013
    DESCRIPTION: Resurfacing of U.S. Route 62 between Freshley Avenue NE and Federal Avenue N and between McKinley Avenue and State Route 183. Includes resurfacing of State Route 183 from College to Mill streets.
    TRAFFIC: One lane of traffic will be maintained with flaggers during construction.
    •  I-77 and U.S. Route 30, Canton
    COST: $200,000
    START DATE: April 2013
    COMPLETION DATE: Sept. 2013
    DESCRIPTION: Repairs and upgrades to lighting system at the I-77 and U.S. 30 interchange.
    TRAFFIC: Traffic will be maintained on I-77 and U.S. 30. Various ramp closures will occur during construction. Detours will be posted.
    • State Route 172, Massillon
    COST: $500,000
    START DATE: April 2013
    COMPLETION DATE: July 2013
    DESCRIPTION: Resurfacing of State Route 172 from 17th to 27th streets.
    TRAFFIC: One lane of traffic will be maintained with flaggers during construction.
    • State Route 172, Canton
    COST: $1.6 million
    START DATE: April 2013
    COMPLETION DATE: Nov. 2013
    DESCRIPTION: Rehabilitation of the bridge on State Route 172 over a branch of the Nimishillen Creek between Riverside Drive NE and Warner Road SE.
    TRAFFIC: State Route 172 will be closed for 120 days. Detour will be posted.
    • State Route 172, Perry Township
    COST: $2.2 million
    Page 3 of 5 - COMPLETION DATE: Sept. 2013
    DESCRIPTION: Resurfacing of State Route 172 from Eden Avenue NW to Woodlawn Avenue NW. Project also includes drainage repairs and access improvements.
    TRAFFIC: One lane of traffic will be maintained in each direction on State Route 172 throughout construction.
    • State Route 172, Massillon
    COST: $300,000
    START DATE: April 2013
    COMPLETION DATE: July 2013
    DESCRIPTION: Heat straightening of bridge beams on State Route 172 over State Route 21.
    TRAFFIC: One lane of traffic will be maintained by flaggers on State Route 172. State Route 21 southbound will be closed for 20 days and State Route 21 northbound will be closed for 17 days. Detours will be posted.
    • State Route 183, City of Alliance
    COST: $5.9 million
    START DATE: January 2013
    COMPLETION DATE: Nov. 2013
    DESCRIPTION: Lower the roadway grade to create more vertical clearance for the Norfolk Southern railroad bridge.
    TRAFFIC: State Route 183 will be closed for 180 days. Ely Street will be closed for 45 days. Closures will not occur at the same time. Detours will be posted.
    • State Route 800, Pike Township
    COST: $400,000
    START DATE: May 2013
    COMPLETION DATE: Nov. 2013
    DESCRIPTION: Slide repair on State Route 800 just north of East Sparta.
    TRAFFIC: State Route 800 will be closed for 45 days. Detour will be posted.
    UPCOMING PROJECTS
    • Navarre Road SW, Canton
    COST: $1.7 million
    AWARD DATE: June 2013
    COMPLETION DATE: Nov. 2013
    DESCRIPTION: Upgrade traffic signals along 14 intersections on Navarre Road SW from Harrison Avenue SW to Market Avenue SW, on 15th Street from Harrison Avenue SW to Cleveland Avenue SW and on Cleveland Avenue SW from Market Avenue to Ninth Street.
    TRAFFIC: One lane will be maintained with flaggers during construction.
    • U.S. Route 30 & State Route 183, Minerva; Paris and Washington townships
    COST: $3.1 million
    AWARD DATE: August 2013
    COMPLETION DATE: June 2014
    DESCRIPTION: Resurfacing of U.S. Route 30 from Hart Avenue to the Columbiana County line and the resurfacing of State Route 183 from Market Street to Beech Street. Includes minor bridge repairs.
    TRAFFIC: One lane of traffic will be maintained with flaggers during construction. State Route 183 will be closed for five days for bridge repairs. Detour will be posted.
    • U.S. Route 30 & Harrison Avenue, Canton
    COST: $1.7 million
    AWARD DATE: April 2013
    Page 4 of 5 - COMPLETION DATE: Oct. 2013
    DESCRIPTION: Resurfacing of Harrison Avenue from Navarre Road to 15th Street. Includes bridge deck overlays and bridge painting to four structures on U.S. 30.
    TRAFFIC: One lane of traffic will be maintained with flaggers during construction. Weekend closures will occur for each bridge. Detours will be posted.
    • U.S. Route 30, Paris Township
    COST: $900,000
    AWARD DATE: May 2013
    COMPLETION DATE: Oct. 2013
    DESCRIPTION: Slide repair on U.S. Route 30 between Rosehill Street SE and Freedmont Road SE.
    TRAFFIC: U.S. 30 will be closed for 60 days. Detour will be posted.
    • State Routes 44 & 171, Waynesburg; Sandy and Osnaburg townships
    COST: $2.3 million
    AWARD DATE: April 2013
    COMPLETION DATE: Oct. 2013
    DESCRIPTION: Resurfacing of State Route 44 from State Route 43 to U.S. 30 and the resurfacing of State Route 171 from State Route 183 to the Carroll County line. Includes bridge repairs and three culvert replacements on State Route 44 between Mapleton Street and Church Street, State Route 44 between Mapleton Street and Orchard View Street, and on State Route 171 just west of the Carroll County line.
    TRAFFIC: Traffic will be maintained with flaggers during resurfacing. State Route 44 will be closed for three days at each culvert location and State Route 171 will be closed for 28 days. Detours will be posted.
    •: State Route 172, East Canton; Osnaburg and Paris townships
    COST: $2.2 million
    AWARD DATE: May 2013
    COMPLETION DATE: Oct. 2013
    DESCRIPTION: Resurfacing of State Route 172 from East Canton western corporation limit to the Columbiana County line. Project also includes two bridge deck overlays.
    TRAFFIC: One lane of traffic will be maintained with flaggers during construction.
    • State Route 241, Jackson Township
    COST: $1.2 million
    AWARD DATE: July 2013
    COMPLETION DATE: Nov. 2013
    DESCRIPTION: Resurfacing of State Route 241 from the northern Massillon corporation limit to Shady Hollow Road and from just north of State Route 687 to the Summit County line. Includes the addition of a northbound left turn lane at Oakdale Street NW and signal improvements.
    TRAFFIC: One lane of traffic will be maintained with flaggers during construction.
    • State Route 619, Hartville
    COST: $400,000
    AWARD DATE: April 2013
    COMPLETION DATE: Oct. 2013
    DESCRIPTION: Upgrade, interconnect and coordinate four traffic signals on State Route 619 between Market Avenue NW and Kent Avenue NW.
    TRAFFIC: Traffic will be maintained with flaggers during construction.
    Page 5 of 5 -  

        calendar